Built for the companies that make things.
Mid-market manufacturers run on promises made across email, the shop floor, contracts and ERPs — and nobody sees them all at once. Dimbo does, whatever you make and whoever on your team is watching.
The same picture, different failure modes.
Every sector we serve has its own way of losing money to a missed deadline. Dimbo learns the pattern that costs you.
Retailer penalty clauses
0.5%-per-week late-delivery charges, net-weight and quality complaints, lot traceability on demand. Dimbo links the order, the short pick and the complaint before the penalty invoice lands.
Batch deadlines & GMP
Release dates, deviation reports, contract SLAs. Every commitment carries an audit trail, so a QA review or a client audit is a query, not a scramble.
Sovereignty as entry ticket
On-prem is the mandate, not a preference. Contract compliance and delivery commitments tracked on a box in your building, data never touching the outside.
Uptime is the contract
Maintenance windows, SLA uptime clauses, field commitments made on-site. Dimbo catches the drift before it becomes a breach.
Four jobs. One picture underneath.
Different teams open Dimbo for different reasons. They're all reading the same fused signal.
The wedge
Every promise made across email, the floor and contracts — tracked, deduplicated, ranked by cost-at-risk. Nothing falls through because nobody remembered it.
Signal before the fault
Vibration, throughput and OEE drift correlated against incident history, proposed as a work order before the machine stops.
Root cause, not guesswork
Complaints correlated back to the line, the shift, the supplier lot that caused them — with an audit-ready evidence trail attached to every proposal.
See the cash gap coming
Overdue invoices, milestone payments, a rolling 90-day cash forecast built from real open invoices — not a spreadsheet nobody updates.
The wedge: a Deadline Audit, in 48 hours.
Land-and-expand, not a six-month rollout. Bring a slice of your real data — emails, documents, records, an export from your systems. We hand back the picture of your company: the commitments already made, the deadlines at risk, and the cost you can still avoid — before you install anything.
What you get back
- Every open commitment found across your data, by client and by owner
- Deadlines bucketed 30 / 60 / 90 days, ranked by risk
- Contractual deadlines flagged separately from informal promises
- Estimated avoidable cost — penalty clauses, at-risk contracts, overdue invoices
- A narrative summary, not a raw dump — ready to hand to your ops lead
Bring a slice of your data
Quick setup, zero installs, revocable anytime.
Dimbo reads, links, ranks
Commitments extracted, deadlines scored.
You see the risk
Concrete, client-by-client, cost-attached.
Find your first at-risk deadline — free.
No installs, no commitment. A slice of your real data is all it takes to see what's already at risk.